Pyramid Generating Station
Every figure on PlainCarbon is rendered directly from EPA Greenhouse Gas Reporting Program (GHGRP) data, no number is typed in by an editor. This page draws directly on the EPA Greenhouse Gas Reporting Program (GHGRP), no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.
LORDSBURG, NM · Hidalgo · NAICS 221112
Data updated May 2026
Annual Emissions History
| Year | Total CO2e (MT) |
|---|---|
| 2023 | 157,983 |
| 2022 | 41,049 |
| 2021 | 47,838 |
| 2020 | 68,899 |
| 2019 | 148,005 |
| 2018 | 37,207 |
| 2017 | 19,173 |
| 2016 | 14,017 |
| 2015 | 26,163 |
| 2014 | 38,495 |
| 2013 | 32,654 |
| 2012 | 92,467 |
| 2011 | 22,302 |
Facility Insight: Pyramid Generating Station
Pyramid Generating Station (EPA GHGRP Facility ID 1000181) reported 158K metric tons of CO2-equivalent in 2023, operating in LORDSBURG, NM within Hidalgo. The site is classified under Power Plants with NAICS code 221112.
The facility has 13 years of reported data on record, covering the 2011–2023 window. Over that period, annual CO2e emissions rose by 608.4%, with the peak observed year showing up to 158K MT CO2e.
Emissions Analysis
Pyramid Generating Station is a moderate emitter at 158K MT CO2e, typical of mid-sized industrial operations.
Frequently Asked Questions
How much CO2 does Pyramid Generating Station emit? ▼
Pyramid Generating Station reported 158K MT CO2e in 2023.
Is Pyramid Generating Station reducing emissions? ▼
Over 13 reporting years (2011–2023), Pyramid Generating Station's emissions have increased by 608.4%. This may reflect expanded operations or increased production.