DAKOTA MUNICIPAL SOLID WASTE LANDFILL
Every figure on PlainCarbon is rendered directly from EPA Greenhouse Gas Reporting Program (GHGRP) data, no number is typed in by an editor. This page draws directly on the EPA Greenhouse Gas Reporting Program (GHGRP), no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.
GWINNER, ND · SARGENT COUNTY · NAICS 562212
Data updated May 2026
Annual Emissions History
| Year | Total CO2e (MT) |
|---|---|
| 2023 | 65,008 |
| 2022 | 64,716 |
| 2021 | 64,289 |
| 2020 | 63,758 |
| 2019 | 63,271 |
| 2018 | 62,550 |
| 2017 | 62,126 |
| 2016 | 61,553 |
| 2015 | 60,710 |
| 2014 | 59,444 |
| 2013 | 57,864 |
| 2012 | 67,620 |
| 2011 | 88,949 |
Facility Insight: DAKOTA MUNICIPAL SOLID WASTE LANDFILL
DAKOTA MUNICIPAL SOLID WASTE LANDFILL (EPA GHGRP Facility ID 1003583) reported 65K metric tons of CO2-equivalent in 2023, operating in GWINNER, ND within SARGENT COUNTY. The site is classified under Waste with NAICS code 562212.
The facility has 13 years of reported data on record, covering the 2011–2023 window. Over that period, annual CO2e emissions declined by 26.9%, with the peak observed year showing up to 89K MT CO2e.
Emissions Analysis
DAKOTA MUNICIPAL SOLID WASTE LANDFILL reports 65K MT CO2e, placing it among smaller reporting facilities in the GHGRP.
Frequently Asked Questions
How much CO2 does DAKOTA MUNICIPAL SOLID WASTE LANDFILL emit? ▼
DAKOTA MUNICIPAL SOLID WASTE LANDFILL reported 65K MT CO2e in 2023.
Is DAKOTA MUNICIPAL SOLID WASTE LANDFILL reducing emissions? ▼
Over 13 reporting years (2011–2023), DAKOTA MUNICIPAL SOLID WASTE LANDFILL's emissions have decreased by 26.9%. This suggests meaningful progress in emissions reduction.