SEAWATER TREATMENT PLANT
Every figure on PlainCarbon is rendered directly from EPA Greenhouse Gas Reporting Program (GHGRP) data, no number is typed in by an editor. This page draws directly on the EPA Greenhouse Gas Reporting Program (GHGRP), no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.
Prudhoe Bay, AK · NORTH SLOPE · NAICS 211120
Data updated May 2026
Annual Emissions History
| Year | Total CO2e (MT) |
|---|---|
| 2023 | 165,230 |
| 2022 | 161,270 |
| 2021 | 158,976 |
| 2020 | 178,738 |
| 2019 | 131,849 |
| 2018 | 103,878 |
| 2017 | 118,689 |
| 2016 | 88,584 |
| 2015 | 108,559 |
| 2014 | 146,820 |
| 2013 | 154,455 |
| 2012 | 175,382 |
| 2011 | 129,360 |
Facility Insight: SEAWATER TREATMENT PLANT
SEAWATER TREATMENT PLANT (EPA GHGRP Facility ID 1007371) reported 165K metric tons of CO2-equivalent in 2023, operating in Prudhoe Bay, AK within NORTH SLOPE. The site is classified under Petroleum and Natural Gas Systems with NAICS code 211120.
The facility has 13 years of reported data on record, covering the 2011–2023 window. Over that period, annual CO2e emissions rose by 27.7%, with the peak observed year showing up to 179K MT CO2e.
Emissions Analysis
SEAWATER TREATMENT PLANT is a moderate emitter at 165K MT CO2e, typical of mid-sized industrial operations.
Frequently Asked Questions
How much CO2 does SEAWATER TREATMENT PLANT emit? ▼
SEAWATER TREATMENT PLANT reported 165K MT CO2e in 2023.
Is SEAWATER TREATMENT PLANT reducing emissions? ▼
Over 13 reporting years (2011–2023), SEAWATER TREATMENT PLANT's emissions have increased by 27.7%. This may reflect expanded operations or increased production.