Facility ID: 1011795 · Other

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7

Verify with EPA →

Fairbanks, AK · NORTH SLOPE BOROUGH · NAICS 486110

Data updated May 2026

9K MT CO₂e · 2020

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 ranks among smaller GHGRP totals (#7,698 of 8,713 nationally; #70 of 77 in AK), a lower-footprint comparator in Other.

  • National rank #7,698 of 8,713 GHGRP facilities
  • #70 of 77 in AK
  • #1,445 of 1,599 in Other
  • -74.3% since 2014

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 vs all U.S. GHGRP facilities

Where this site's latest reported Scope 1 CO₂e sits among every EPA GHGRP reporting facility

8,913 7698th of 8713 higher than 1,015 of 8,713 facilities

GHGRP facilities, banded by latest reported CO₂e (MT)

Each bar is a band; taller bars hold more facilities. The dashed line + filled bar mark this entry. Hover or tap any bar for its full count and share, and where it sits relative to this entry.

Source EPA Greenhouse Gas Reporting Program · 2020

Facility footprint context

Inside the EPA Other sector it ranks #1,445 of 1,599 facilities by latest CO₂e. Shares use GHGRP facility rollups only, not Scope 2/3 or non-reporting sites.

Emissions decline across reporting years

2014
2015
2016
2017
2018
2019
2020
Year Total CO2e (MT)
2020 8,913
2019 11,251
2018 11,439
2017 11,708
2016 16,520
2015 35,760
2014 34,645

Facility insight: TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 (ID 1011795) reported 9K MT CO₂e for 2020 in NORTH SLOPE BOROUGH, AK (#7,698 of 8,713 by latest CO₂e).

Across 2014–2020, annual CO₂e fell 74.3%; peak load was 36K MT in 2015. This facility has filed every year from 2014 to 2020, a complete 7-year record.

Peak year was 2015 at 36K MT CO2e; latest 2020 sits 75.1% below that peak (9K MT). The largest year-to-year move was 2015→2016 (-53.8%, 19K MT).

Frequently Asked Questions

Where does TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 rank among U.S. GHGRP facilities?

According to the EPA Greenhouse Gas Reporting Program, TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 ranks #7,698 of 8,713 reporting facilities by latest reported CO₂e, and #70 of 77 facilities in AK (same sort as the state facility table). See /methodology#corpus-placement.

What share of GHGRP facilities report less CO₂e than TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7?

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7's 9K MT CO₂e is higher than 1,015 of the 8,713 GHGRP facilities with reported emissions (12%), an exact count from the full corpus, not an estimate.

How much CO2 does TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 emit?

TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 reported 9K MT CO2e in 2020.

Where does TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 rank inside Other?

Among EPA GHGRP facilities tagged Other, TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 ranks #1,445 of 1,599 by latest reported CO₂e.

Is TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7 reducing emissions?

Over 7 reporting years (2014–2020), TRANS ALASKA PIPELINE SYSTEM PUMP STATION 7's emissions have decreased by 74.3%. This suggests meaningful progress in emissions reduction.

Nationwide facilities with similar CO₂e or sector

Lower-footprint peers outside AK: nearest CO₂e totals and same-sector reporters for context.

Data sourced from the EPA Greenhouse Gas Reporting Program (GHGRP), Facility ID 1011795. Data subject to facility self-reporting, not compliance advice. See our methodology for how this data is sourced, computed, and verified. Retrieved and formatted by PlainCarbon